2
Note: In this stage, firmly tighten all the bolts to properly secure,
align and square off the unit. You can use the supplied self-tapping
screws to further stabilize the unit.
4
Bottom frame assembly
1. Using the top bracket subassembly, align the vertical rail with the
bottom bracket, base extension plate and base stand.
2. The mounting hole of the extension plate must be placed upward.
3. Next, install the M8 bolts and washers to secure all parts together.
4. Repeat the same step for the other side.
Top bracket subassembly
Bottom support bracket (1)
Base horizontal plates (2)
M8 hexagonal bolts (8)
Base stand with holes for anchoring (2)
3
5
4
6
3
Rack frame assembly
Installation of the cable management hooks
1. At this point, place the rack in the upright position.
Note: at least two people are required for lifting up the structure, for
safety reasons.
2. Align the cable management hooks with the cable management
screw holes along the side of the rack in the preset mounting
locations, while keeping the hook openings pointing sideways. Refer
to the image below.
Anchoring of the structure
1. At this point, we highly recommend securing the base stand with
the pre-drilled holes to the floor, in order to comply with safety
requirements.
2. Use the provided anchoring bolts which are specifically designed
to stabilize and secure the unit upright to a concrete or hard surface
in your workspace.
3. Use the self-tapping screws to fasten the hooks to the rails.
16
17
M4 phillips self-tapping screws (8 or 14)
Cable management hooks (8 or 14)
16
17
9
10
11
12
M8 flat metal washers (8)
7
5
4
6
7
Anchoring bolts (4)
Split-lock washers (4)
Metal washers (4)
M10 nuts (4)
7
8
1
5
5
3
Summary of Contents for Professional Series
Page 7: ...Notes Notes 11 12 ...
Page 8: ......