![Nexus 21 L-27i Installation Instructions Manual Download Page 16](http://html1.mh-extra.com/html/nexus-21/l-27i/l-27i_installation-instructions-manual_1684601016.webp)
16
Installing the Lid Stabilization Assembly
The two Lid Stabilization Assemblies (each consisting of parts #21 - 25) are used to hold the Ceiling Cover Cut-out in
proper alignment with ceiling opening. The assemblies are spring loaded so the Ceiling Cut-out will stop level with the
ceiling allowing the Lift to travel an additional 1/8 ”– 1/2” up into the ceiling. You should create a “stop”, or “lip” above
the ceiling, around the edge of the opening, for your Ceiling Cover to pull up against, like an upside-down manhole cover.
This illustration shows how it should work, and details for assembly are shown on the following pages.