Next 852763 Assembly Instructions Download Page 3

1. Put pebble bed 2 onto the vessel as shown.

1. Use a pencil to mark the fixing position on the wall.

STEP FOUR

STEP ONE

STEP TWO

STEP THREE

3. Secure brackets (A) to the wall with appropriate 
screws. Tighten with a screwdriver.

WARNING: Ensure the area to be drilled is free from 
hidden electrical wires and water or gas pipes.

NOTE: Wall fixings are not included. Please source 
suitable wall fixings for your wall type, if in doubt consult 
a qualified tradesperson.

1. Lift the suite on to the wall brackets as shown in the 
diagram.

NOTE: Two people are needed for this step and this will 
involve some angling of the suite to get the correct
position.

2. Drill four holes and insert an appropriate wall plug into 
each. 

1. Put pebbbles 3 to cover the pebble bed evenly.

NOTE:
You can adjust how the light filters through by slightly 
adjusting the position of the pebbles once the unit is 
switched on.

Reviews: