2
2
2
2
2
FORM NO. L-20286A-1199
RING GUARD INSTALLATION
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
Always have a Ring Guard Assembly in place when
Always have a Ring Guard Assembly in place when
Always have a Ring Guard Assembly in place when
Always have a Ring Guard Assembly in place when
Always have a Ring Guard Assembly in place when
operating Nexen Clutches or Brakes. Nexen
operating Nexen Clutches or Brakes. Nexen
operating Nexen Clutches or Brakes. Nexen
operating Nexen Clutches or Brakes. Nexen
operating Nexen Clutches or Brakes. Nexen
recommends using Product No. 826300 with the TSE-
recommends using Product No. 826300 with the TSE-
recommends using Product No. 826300 with the TSE-
recommends using Product No. 826300 with the TSE-
recommends using Product No. 826300 with the TSE-
800-1 Brake.
800-1 Brake.
800-1 Brake.
800-1 Brake.
800-1 Brake.
1.
Slide the Ring Guard over the TSE Brake by aligning the
Ring Guard attachment hook ends with the notches in
the TSE Housing; then, turn the Ring Guard to the closest
attachment hole.
2.
Secure the Ring Guard to the Housing of the TSE Brake
using the four Pan Head Screws, Flat Washers, Lock
Washers, and Hex. Head Nuts provided with the Ring
Guard (See Figure 2).
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
Shoulder Screws are spring loaded. Always wear
Shoulder Screws are spring loaded. Always wear
Shoulder Screws are spring loaded. Always wear
Shoulder Screws are spring loaded. Always wear
Shoulder Screws are spring loaded. Always wear
safety goggles when working with spring or tension
safety goggles when working with spring or tension
safety goggles when working with spring or tension
safety goggles when working with spring or tension
safety goggles when working with spring or tension
loaded fasteners or devices.
loaded fasteners or devices.
loaded fasteners or devices.
loaded fasteners or devices.
loaded fasteners or devices.
1.
Alternately and evenly remove and discard old Shoulder
Screws (Item 6) (See Figure 1).
2.
Remove and discard old Cylinder (Item 10) (See Figure 1).
3.
Remove Compression Springs (Item 7) (See Figure 1).
4.
Remove and discard the old O-ring Seals (Items 11 and
12) (See Figure 1).
1
1
1
1
1
14
14
14
14
14
5
5
5
5
5
15
15
15
15
15
4
4
4
4
4
8
8
8
8
8
9
9
9
9
9
12
12
12
12
12
11
11
11
11
11
10
10
10
10
10
16
16
16
16
16
2
2
2
2
2
3
3
3
3
3
6
6
6
6
6
PARTS REPLACEMENT
PARTS REPLACEMENT
PARTS REPLACEMENT
PARTS REPLACEMENT
PARTS REPLACEMENT
N O T E
N O T E
N O T E
N O T E
N O T E
This conversion kit requires complete disassembly of the TSE-800. In addition to the following procedure, it is
This conversion kit requires complete disassembly of the TSE-800. In addition to the following procedure, it is
This conversion kit requires complete disassembly of the TSE-800. In addition to the following procedure, it is
This conversion kit requires complete disassembly of the TSE-800. In addition to the following procedure, it is
This conversion kit requires complete disassembly of the TSE-800. In addition to the following procedure, it is
recommended to replace the friction facings, compression springs, and hardware during rebuild (reference PARTS
recommended to replace the friction facings, compression springs, and hardware during rebuild (reference PARTS
recommended to replace the friction facings, compression springs, and hardware during rebuild (reference PARTS
recommended to replace the friction facings, compression springs, and hardware during rebuild (reference PARTS
recommended to replace the friction facings, compression springs, and hardware during rebuild (reference PARTS
LIST information in maintenance manual L-20077 for facing and repair kit numbers). If friction facings, compression
LIST information in maintenance manual L-20077 for facing and repair kit numbers). If friction facings, compression
LIST information in maintenance manual L-20077 for facing and repair kit numbers). If friction facings, compression
LIST information in maintenance manual L-20077 for facing and repair kit numbers). If friction facings, compression
LIST information in maintenance manual L-20077 for facing and repair kit numbers). If friction facings, compression
springs, and hardware are not replaced during rebuild, retain components for reinstallation.
springs, and hardware are not replaced during rebuild, retain components for reinstallation.
springs, and hardware are not replaced during rebuild, retain components for reinstallation.
springs, and hardware are not replaced during rebuild, retain components for reinstallation.
springs, and hardware are not replaced during rebuild, retain components for reinstallation.
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
W A R N I N G
Spring Housing and Plate are spring loaded and can
Spring Housing and Plate are spring loaded and can
Spring Housing and Plate are spring loaded and can
Spring Housing and Plate are spring loaded and can
Spring Housing and Plate are spring loaded and can
spring apart and cause personal injury if they are not
spring apart and cause personal injury if they are not
spring apart and cause personal injury if they are not
spring apart and cause personal injury if they are not
spring apart and cause personal injury if they are not
clamped together.
clamped together.
clamped together.
clamped together.
clamped together.
5.
Using 'C'-clamps, compress Spring Housing (Item 4)
against Plate (Item 3) (See Figure 1).
6.
Remove and discard the three Socket Head Cap Screws
(Item 16) (See Figure 1).
7.
Remove the Piston (Item 2) (See Figure 1).
FIGURE 2
FIGURE 2
FIGURE 2
FIGURE 2
FIGURE 2
RING GUARD ASSEMBLY
RING GUARD ASSEMBLY
RING GUARD ASSEMBLY
RING GUARD ASSEMBLY
RING GUARD ASSEMBLY
FIGURE 1
FIGURE 1
FIGURE 1
FIGURE 1
FIGURE 1
TSE-800
TSE-800
TSE-800
TSE-800
TSE-800
Ring Guard
Flat Washers
Lock Washers
Hex. Head
Nuts
Pan Head
Screws
7
7
7
7
7
®
DIST. AUTORIZADO
MEX (55) 53 63 23 31
QRO (442) 1 95 72 60
MTY (81) 83 54 10 18
[email protected]