Copyright © 2019 NEXCOM International Co., Ltd. All Rights Reserved.
50
NISE 505 User Manual
Appendix A: Power Consumption
a
PPendIx
a: P
ower
C
onsumPtIon
Power Consumption Management
Purpose
The purpose of the power consumption test is to verify the power dissipation
of the system, and the loading of the power supply.
Test Equipment / Software
1. DC power supply
2. Operating System OS: Windows 10 64-bit
3. Burn-In Test Ver: 8.1 Pro (1025)
4. Intel
®
Thermal Analysis Tool software version: 6.0.1013
5. Network test program
6. Function port fixture:
Functional Port
Front / Rear Panel
USB 2.0 x2
5V, 0.5A (Cement Resistor)
COM 1
RS232 Loopback (115200 baud rate)
HDMI
LCD Monitor
USB
Keyboard & Mouse
Test Procedure
1. Make sure mechanical structure and electrical functionality are normal
before testing.
2. Install all I/O load devices and according as system input voltage
specifications to set up DC power supply voltage.
3. Measure system maximum power consumption as below mode:
– BIOS Mode
– ACPI Sleep State Mode (S3)
– 100% Full Loading Mode (Include USB load fixture)
4. Measure and record system maximum power consumption value.