Appendix A: Power Consumption
Power Consumption Management
Purpose
The purpose of the power consumption test is to verify the power dissipation
of system, and the loading of power supply.
Test Equipment
PROVA CM-07 AC/DC CLAMP METER
device Under Test
DUT: sys#1/ sys#2
Test Procedure
1. Power up the DUT, boot into Windows 8 x64 Pro.
2. Entering standby mode (HDD power down).
3. Measure the power consumption and record it.
4. Run Burn-in test program to apply 100% full loading.
5. Measure the power consumption and record it.
Test data
Sys #1
Sys #1
+30V
+9V
Full-Loading Mode
1.13A
3.89A
Total
33.9W
35.1W
Standby S3 Mode
0.16A
0.27A
Total
4.8W
2.4W