ABS1376-01/A
37/44
DOMINO - STANDARD ORGANIZER
4. Strip the fibres 5mm past the comb and perform the splices.
Comb for 900
μ
m fibres
5 mm
D
Pathway
Large tray
Splice
3
1. Install the plastic cable guides (1).
4. Coil the fibres in the cable guides (1).
Towards plate
2. Clamp the fanout device on its support using
2 plastic collars (2).
1
3. Mount the fanout device (3) with its holder at the
back of the module using the screw provided.
2
2
Pre-install the
securing screw.
To clamp the secondary
fanout device, the screw must
be installed at the bottom.
4.4 Pre-terminated cables
Summary of Contents for DOMINO 100
Page 7: ...ABS1376 01 A 7 44 DOMINO STANDARD ORGANIZER V 165 10 1 1 8 13 14 1 2 3 4 5 6 7 9 8 12 ...
Page 8: ...ABS1376 01 A 8 44 DOMINO STANDARD ORGANIZER 12 1 1 14 5 1 2 3 4 6 7 8 9 10 13 8 V 210 ...
Page 13: ...ABS1376 01 A 13 44 DOMINO STANDARD ORGANIZER V 210 1 2 3 3 ...
Page 44: ...ABS1376 01 A 44 44 DOMINO STANDARD ORGANIZER ...