4
5
B6
C3
C3
b. Wood floor
7
B2
D3
C1
C3
C3
C6
Fix assembly to floor
a. Concrete
3
4
Tag line
6
B5
D4
B4
B6
T
V
w
id
th
NMPRO-S1
1
5
0
0
mm
NMPRO-S21
NMPRO-S12
18
Mark the lines in same
height on the pillar
Lock D4 into the
marked line position
NOTES:
B6 (NMPRO-S1) 4PCS
B6 (NMPRO-S21) 4PCS
B6 (NMPRO-S12) 8PCS
B6 (NMPRO-S22) 8PCS
B6 (NMPRO-S32) 8PCS
B6 (NMPRO-S33) 12PCS
NOTES:
each pillar
each pillar
each pillar
each pillar
each pillar
each pillar
Summary of Contents for Neomounts Pro NMPRO-M12
Page 1: ......
Page 2: ...OVERVIEW Section 1 With Wheels Page 2 Section 2 With Floor Plate Page 14 ...
Page 7: ...6 7 8 5mm 5mm C1 C1 9 A 5mm C1 NMPRO M21 NMPRO M22 NMPRO M32 NMPRO M33 ...
Page 10: ...9 16 5mm 17 Top of TV A4 18 19 B5 B4 Cable Management A1 A2 A3 ...
Page 11: ...10 20 21 C3 wire cable 3 3 3 Adjust the vertical position of TV Height adjustment 10mm ...
Page 22: ...15 B5 B4 5mm 16 Top of TV A4 17 18 21 Cable Management A1 A2 A3 ...
Page 23: ...19 21 Adjust the vertical position of TV 3 3 3 Wire Height adjustment 10mm 22 ...