3.
Installation
3.
Installation
3.1.
Contents of Delivery
Pulse
Scout2
base unit - consisting of:
ˆ
scout
Link
controller
ˆ
Pulse
Scout2
optical head
ˆ
25-pin D-Sub connection cable for the optical head
ˆ
USB cable type "A-B"
ˆ
Trigger input cable
ˆ
Alignment base
ˆ
Foot clamps (3x)
ˆ
M6 screw
ˆ
Nylon washer
ˆ
12-V DC power supply (US)
ˆ
Detector ansh (mounted)
ˆ
M4 screw (mounted)
ˆ
Pulse
Scout2
user manual
ˆ
Certi cate of Calibration
ˆ
USB Flash Drive, including installation software
ˆ
Final Test Protocol
Pulse
Scout2
detector module incl. crystal (packed separately)
3.2.
Inspection on Receiving
On receipt of the
Pulse
Scout2
autocorrelator system:
1. Inspect the packing material for signs of rough handling or damage directly at arrival.
If you discover any irregularities:
ˆ
Take photographs of the condition of the package, the labels and the inside of the box,
if necessary.
ˆ
Inform your
Pulse
Scout2
vendor immediately.
2. Use safe lifting practices.
3. Allow at least six hours for acclimatization of all components before unpacking and operating
the device.
4. Unpack the
Pulse
Scout2
system.
5. It is suggested to retain the packaging for future use.
Pulse
Scout2 Version 1.1
16
July 2015