![newmotion Home Fast 2.1 Instruction Manual Download Page 10](http://html1.mh-extra.com/html/newmotion/home-fast-2-1/home-fast-2-1_instruction-manual_1679898010.webp)
INSTALLATIEHANDLEIDING – P10
VERSION 0129NM02INT01
INSTRUCTION MANUAL – P10 |
P10
0381NM02INT02
EN
NL
DE
FR
3. PRODUCT OVERVIEW
3.4 OVERVIEW OF CONNECTIONS
neutral wire
connection
phase wire
connection
earth wire
connection
power cable
cable clamp
earthing pole
connection
earthing
pole
inlet for
data cable
Dip switches for
settings
If connecting to a 3-phase grid without neutral; only install 1-phase and connect one of the two other phase wires
in the neutral wire connection on the terminal block.
DC-fault
protection
module
DC-fault
protection
connection
ethernet port