background image

INSTALLATIEHANDLEIDING – P12 

VERSION 0129NM02INT01 

INSTRUCTION MANUAL – P12  | 

P12

075NM19INT01

EN

DE

3.5 BACKOFFICE CONNECTIONS 

The Home Advanced can be connected to the 
NewMotion backoffice in three ways:
   1. Ethernet connection 
   2. GPRS 2G
   3. 2/3/4G with NewMotion mobile router

The Home Advanced View will connect to the New 
Motion backoffice so settings can be changed remotely 
and for remote support to be given. Without the 
backoffice connection, none of our online services can 
be used.

3.5.1 HOME ADVANCED VIEW – ETHERNET / 

NEWMOTION MOBILE ROUTER

Connecting the Home Advanced View to an ethernet or 
mobile router can be done by connecting the network 
to the left UTP Ethernet data port with a cable max 50 
meter long. 

Settings might have to be changed in the network to 
allow the charge point to make a successful connection 
to the NewMotion backoffice.

The network should have:
   - DHCP
   - Port TCP 80 and 443 should be opened
   - FTP port 21 should be opened
   - All opened ports should be inbound and outbound

FTP is needed to update the firmware of the chargepoint 
and exchange diagnostics.

3. PRODUCT OVERVIEW

(Mobile) 

Router

Summary of Contents for Home Advanced View

Page 1: ...INSTALLATION MANUAL Home Advanced View 3 7 22 kW INSTRUCTION MANUAL EN INSTALLATIONSANLEITUNG DE VERSION 075NM19INT01...

Page 2: ......

Page 3: ...NewMotion Home Advanced View 3 7 22 kW Table of contents Inhaltsverzeichnis DE 49 0 30 215 028 48 Instruction manual EN Pages 4 16 Installationsanleitung DE Pagina 17 30...

Page 4: ...y guidelines are intended to ensure correct in stallation and usage Any failure to comply with the valid safety guidelines or instructions provided in this manual may result in fire electrocution or s...

Page 5: ...eady for use the owner needs to activate the charge point through our online portal at my newmotion com The serial number of the charge point is needed for this process which can be found on the right...

Page 6: ...ure Spirit level All mentioned for standard mounting plus Pole sold separately 4 x M8 wedge bolts or chemical anchors plus nuts and washers All mentioned for pole mounting plus Concrete base sold sepa...

Page 7: ...tness IEC 60529 IP code protection class EN 50470 M class EN 50470 E class Certificates kWh measurement User interface 07 5 _ _ _ _ _ 1 phase 32A 7 4 kW 3 phase 32A 22 kW 1 phase 16A 3 7kW 3 phase 16A...

Page 8: ...otective Earth connection Class I 3 2 TECHNICAL SPECIFICATIONS 3 PRODUCT OVERVIEW Identification Communication backoffice Communication Smart Meter Backoffice protocol Stand by consumption Operating t...

Page 9: ...INSTALLATIEHANDLEIDING P9 VERSION 0129NM02INT01 INSTRUCTION MANUAL P9 P9 075NM19INT01 EN DE 3 PRODUCT OVERVIEW 3 3 OVERVIEW OF PRODUCT...

Page 10: ...1 phase and connect one of the two other phase wires in the neutral wire connection on the terminal block INSIDE RJ45 Ethernet port RJ12 P1 port DPM UTP data cable inlet with rubber seal Inlet for pow...

Page 11: ...t with rubber seal UTP data cable inlet with rubber seal Inlet for power cable with tension relief clamps Terminal block DC protection module Connection DC protection module Tension relief for data ca...

Page 12: ...r online services can be used 3 5 1 HOME ADVANCED VIEW ETHERNET NEWMOTION MOBILE ROUTER Connecting the Home Advanced View to an ethernet or mobile router can be done by connecting the network to the l...

Page 13: ...uation and according to regulations The electrician is always responsible for selecting a cable thickness appropriate for the specific situation and according to regulations 3 phase charge point can a...

Page 14: ...attachment points Ensure that the grey spacers are placed on the back of the charge point at the bottom two attachment points 5 2B MECHANICAL MOUNT POLE ON PAVEMENT Step 1 Drill holes into the pavemen...

Page 15: ...charge point Step 3 Hand tighten the four M4 x 12mm bolts provided around the socket so that the cover closes on the rubber seal but the rubber seal does not deform Step 4 Hand tighten the other two M...

Page 16: ...ge point by plugging in the charge cable If you are using Plug Charge the session will start automatically If you have to identify first swipe your charge card above the LED The LED will flash green t...

Page 17: ...ng gew hrleisten Die Nichteinhaltung der Richtlinien und Anweisungen in diesem Handbuch kann zum Brand Stromschlag oder zu schweren Verletzungen f hren Die Ladestation ist ein Produkt der Schutzklasse...

Page 18: ...satz vorzubereiten muss der Eigent mer die Ladestation ber unser Online Portal my newmotion com aktivieren Die Seriennummer der Ladestation wird in diesem Prozess ben tigt und kann auf der rechten Sei...

Page 19: ...plus Mast separat erh ltlich 4 M8 Keilbolzen oder Verbundanker plus Muttern und Unterlegscheiben Alle f r die Mastbefestigung erw hnten Elemente plus Betonsockel separat erh ltlich DIN 912 HEX Inbussc...

Page 20: ...Code Schutzklasse EN 50470 M klasse EN 50470 E klasse Zertifikate kWh Messung Benutzeroberfl che 07 5 _ _ _ _ _ 1 phasig 32 A 7 4 kW 3 phasig 32 A 22 kW 1 phasig 16 A 3 7 kW 3 phasig 16 A 11 kW Klass...

Page 21: ...e Klasse II Montage am Metallmast mit Schutzleiteranschluss Klasse I 3 2 TECHNISCHE DATEN 3 PRODUKT BERSICHT Identifizierung Backoffice Kommunikation Kommunikations Smart Meter Backoffice Protokoll St...

Page 22: ...INSTALLATIEHANDLEIDING P22 VERSION 0129NM02INT01 INSTALLATIONSANLEITUNG P22 P22 075NM19INT01 EN DE 3 3 BERSICHT BER DAS PRODUKT 3 PRODUKT BERSICHT...

Page 23: ...er aufbauen Installieren Sie nur die Phase 1 und verbinden Sie einen der beiden anderen Phasendr hte mit dem Nullleiter Anschluss INSIDE RJ45 Ethernet Anschluss RJ12 P1 port DPM Einlass f r UTP Datenk...

Page 24: ...TP Datenkabel mit Gummidichtung Kabeldurchf hrung festes Ladekabel Klemmblock DC Schutzmodul Anschluss DC Schutzmodul Zugentlastung f r Datenkabel L1 N PE Erdung Erdungspfosten Phase 2 Phase 3 3 PRODU...

Page 25: ...ME ADVANCED VIEW ETHERNET NEWMOTION MOBILROUTER Die Verbindung von Home Advanced View zum Ethernet oder Mobilrouter kann hergestellt werden indem das Netzwerk ber ein max 50 Meter langes Kabel an den...

Page 26: ...antwortlich Der Elektriker ist f r die Auswahl einer f r die spezifische Situation und die gesetzlichen Bestimmungen geeigneten Kabeldicke verantwortlich Die 3 phasige Ladestation kann auch 1 phasig a...

Page 27: ...er Schrauben Unterlegscheiben Schritt 3 Sichern Sie die Ladestation an der Wandhalterung mit den mitgelieferten zwei M8 x 12 mm Schrauben und den entsprechenden Unterlegscheiben Schritt 4 Befestigen S...

Page 28: ...5 5B KOMMUNIKATIONSVERBINDUNG EN GPRS Schritt 1 Pr fen Sie ob die Signalst rke ausreicht 5 6 OPTIONALER DPM SEPARAT ERH LTLICH Schritt 1 Beachten Sie das DPM Installationshandbuch in Verbindung mit di...

Page 29: ...nd die Verbindung Auf dem Display sollte der Startbildschirm angezeigt werden siehe unten Schritt 3 Datum und Uhrzeit m ssen als grauer Text angezeigt werden Wenn roter Text angezeigt wird ist das SME...

Page 30: ...lug Charge verwenden wird die Sitzung automatisch gestartet Wenn Sie sich zuerst identifizieren m ssen streichen Sie Ihre Ladekarte ber die LED Die LED blinkt gr n um die Karte zu authentifizieren Nac...

Page 31: ......

Reviews: