
P.O. Box 1306
Newport Beach
California 92663
Phone: 714-751-0488
Fax: 714-957-1621
E-Mail: [email protected]
www.newmartelecom.com
Unity Low Voltage
Disconnect & Monitor
Installation/Operation Manual
Model: ULM-100
Table of Contents
Page Table of Contents
Page
1.0 Overview
2
5.14 LVD Level Mapping
4
2.0 Materials Provided
2
5.2 Meter
4
3.0 Mounting
2
5.21 Voltage Monitoring
4
3.1 Rack Ears
2
5.23 Backlighting Adjustment
4
4.0 Wiring
2
5.24 Temperature Monitoring
4
4.1 Rectifier Input
2
5.25 Meter Power Source Selector
4
4.2 Battery Input
2
5.26 Restore to Factory Settings
5
4.3 Load Output
2
5.3 Battery Circuit Breaker
5
4.4 Alarms
3
5.4 Alarm LED
5
5.0 Operation & Adjustments
3
6.0 Connecting Rectifier Types
5
5.1 Low Voltage Disconnect
3
6.1 Unity Rectifier Shelf (URS)
5
5.1 Manual/Auto Selector Switch
4
6.2 Power Modules (PM Series)
5
5.12 LVD Adjustment
4
7.0 Troubleshooting
6
5.13 LVD Alarms: Pre-Disconnect & Disconnect
4
8.0 Specifications
6
9.0 Outline & Mounting Drawing
7
M-ULM100
030315