Newco NHW-15 Operating Manual Download Page 4

MACHINE SETUP

 

 

PLUMBER'S INSTALLATION INSTRUCTIONS

 

 

 

CAUTION: 

Power to machine must be OFF before proceeding with plumbing installation. 

 

 

1)   Flush water line before installing machine. Machine should be connected to COLD WATER 

LINE for best operation. 

 

2)   Water pressure should be at least 20 psi. For less than a 25 ft. run, use 1/4" copper tubing 

and connect to 1/2" or larger water line. For longer runs, use 3/8" copper tubing & connect to 
1/2" or larger water line and provide an adapter fitting for connection to the machine. 

 

3)   If installed with saddle valve, the valve should have a minimum of 1/8" port hole for up to 25 

ft. run, and 5/16" port hole for over 25 ft. runs. 

 

4)   Connect incoming water line to the flow control device on the back of the machi

ne. A 1/4” 

Flare fitting is provided. Manufacturer recommends connecting to copper tubing. 

 

ELECTRICAL HOOKUP

 

 

WARNING: 

- Read and follow installation instructions before plugging or wiring in machine to 

electrical circuit. Warranty will be void if machine is connected to any voltage other than that 
specified on the name plate. 

 

The machine has a power cord attached for 120 volts.  Machine should be connected to the 
appropriate receptacle type. A wiring diagram at the rear of this manual illustrates the complete 
machine wiring 

 

INSTALLATION INSTRUCTIONS

 

 

WARNING: 

- Read and follow installation instructions before plugging or wiring in machine to 

electrical circuit. 

 

1)   

Make sure machine is level

. Connect machine to water line as describ

ed in “PLUMBER’S 

INSTALLATION INSTRUCTIO

NS”.  Connect to suitable power supply as described in 

“ELECTRICAL HOOKUP”. Tank will begin to fill when connected to power supply. The 
display will indicate 

‘fill’ when filling is in process. Time required to fill the tank is about 4-

1/2 minutes. 

 

2)   Water level in the tank is controlled by a level probe which senses when water contact is 

made. A maximum run time of six minutes is programmed into the machine for the initial fill 
cycle to prevent flooding should an error occur. 

 

3)   

Once the water level has reached the proper water level the tank heater will begin to heat the 
water to the preset temperature. This prevents premature failure of the element by heating it 
dry. This probe will also call for power to be shut off to the element should the probe not 
detect water for 3 minutes. Heating time will be approximately 20 minutes. The heating circuit 
has a maximum continuous run time of 45 minutes. Should the machine call for heat for a 
Time period in excess of 45 minutes the machine will shut down the heating circuit and 
display an Er5 message. See the 

“ERROR MESSAGES” section for instructions on how to 

clear the error and possible causes. The heating icon (thermometer) on the faceplate will 
indicate heating status.  As the preset temperature is approached the icon will begin pulsing 
as the power to the element is cycled on and off. 

 

 

3

Summary of Contents for NHW-15

Page 1: ...NSTALLATION 120 240 V 1650 6600 W US 120 240 V 1350 5500 W CAN CONVERTIBLE 2 GA LLON DRIP TRAY INCLUDED ADVANCED TEMPERATURE CONTROL TVT TECHNOLOGY NEWCO ENTEPRISES 3650 NEW TOWN BLVD ST CHARLES MISSO...

Page 2: ...ing to 3650 New Town Blvd Saint Charles MO 63301 2 if requested by Newco shipping the defective equipment prepaid to an authorized Newco service location and 3 receiving prior authorization from Newco...

Page 3: ...HINE 120 240 VOLTS 3 GAL HR 120V 6 GAL HR 240V 1 PH OPERATING TEMP RANGE 170 DEG F 208 DEG F 7 2 9 16 24 1 8 1 3 8 12 3 8 1 1 2 8 1 2 6 1 4 UNIT CAN BE CONVERTED FROM 120 V 1PH TO 240V 1PH 240V POWER...

Page 4: ...on instructions before plugging or wiring in machine to electrical circuit 1 Make sure machine is level Connect machine to water line as described in PLUMBER S INSTALLATION INSTRUCTIONS Connect to sui...

Page 5: ...PEAR 4 DEPRESS LEFT OR RIGHT BUTTON TO EXIT PROGRAM MODE TEMPERATURE SETTING WILL BE STORED TO MONITOR UPPER AND LOWER WATER TEMPERATURE LEVELS 1 DEPRESS LEFT ARROW TO MONITOR UPPER TANK TEMPERATURE 2...

Page 6: ...PLUMBING AND ELECTRICAL COMPONENTS 11 6 9 7 16 8 15 4 17 10 13 5 1 12 3 2 14 5 800007 C RING UNDER NUT NOT VISIBLE...

Page 7: ...KET NYLON 671 937 062 6 1 104111 VALVE ASSY HOT WATER 7 1 100155 CONNECTOR MALE C X 1 8 NPT WITH NUT 8 1 104135 TUBE COPPER INLET 9 1 511053 BLOCK TERMINAL 120 240V 10 1 104117 TUBE ASSY OVERFLOW 11 1...

Page 8: ......

Page 9: ...WATER INLET 5 1 701286 10 ELEMENT DUAL VOLTAGE 1350W 5500W 6 1 100431 NUT BRASS 9 16 24 7 2 100030 GASKET BRASS 566 ID 8 1 101720 CONNECT FM 3 C X 1 8 NPT 9 1 100149 ELBOW 1 4C 90 DEG W NUT 10 1 70422...

Page 10: ...8 FLOAT SWITCH ASSEMBLY DRIP TRAY FLOAT SWITCH ASSY HI TEMP PN 151529 DRIP TRAY GRATE PN 104134 BRACKET FLOAT SWITCH PN 151734 DRIP TRAY PN 1041339 9...

Page 11: ...ation on page 9 and empty cup 2 The heater element is protected by a hi limit manual reset thermostat ER5 Error Modes To reset an error condition simply power the machine off and back on If the error...

Page 12: ......

Reviews: