3
ELECTRICAL HOOKUP (CONT’D)
5) Make electrical connections as shown below and on the wiring diagram on the back of manual.
Tighten strain relief as applicable.
6) If the brewer has been converted from the original voltage as shown on the serial tag it will be necessary to apply the
appropriate electrical rating decal (Pg 3, Items 5 and 8) in place on the serial tag to cover the previous rating.
Item Part No Description
1
701555 Cord, 15 A
2
101035 Strain Relief, 15 A
3
511005 Plate, Adapter 15 A
4
701467 Cord/Plate Assy 15 A
Includes 1,2 and 3
5
701468 Label, Electrical Rating,
120
V
6
701466 Kit, GX Perm to Cord
Includes 4 and 5
7 511054 Cable
Connector
8
701471 Label, Electrical Rating,
120/240
V
9
701469 Kit, GX Cord to Perm
Includes 7 and 8
INSTALLATION INSTRUCTIONS
WARNING:
- Read and follow installation instructions before plugging or wiring in machine to electrical circuit.
REFER TO THE ILLUSTRATION ON PAGE 6 FOR LOCATION OF REFERENCED COMPONENTS
1) Place the decanter under brew basket, raise top evaporation cover and pour four decanters of water through the top
pour-in screen. Water should come through the brew basket as the fourth decanter of water drains out of the pour in
basin. If brewer does not have a pour in opening remove top cover and pour water directly into
receiving pan. The
brewer tank is now full and the unit may be plugged into or wired to an appropriate voltage circuit as indicated on the
serial tag.
INSTALLATION INSTRUCTIONS (CONT’D)