background image

 

PLUMBER'S INSTALLATION INSTRUCTIONS (AUTOMATIC BREWERS) 

 

CAUTION:

 Power to brewer must be OFF before proceeding with plumbing installation. 

 
1)  Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best operation. 
 
2)  Water pressure should be at least 20 lbs. For less than a 25 ft run, use 1/4" copper tubing and connect to 1/2" or 
 

larger water line. For longer runs, use 3/8" copper tubing & connect to 1/2" or larger water line and provide an 

 

adapter fitting for connection to the brewer. 

 
3)  If installed with saddle valve, the valve should have a minimum of 1/8" port hole for up to 25 ft run, and 5/16" port 
 

hole for over 25 ft runs. 

 
4)  Connect incoming water line to the flow control device on the back of the brewer. Manufacturer recommends 
       connecting to copper tubing. 
 

ELECTRICAL HOOKUP 
 
WARNING:

 - Read and follow installation instructions before plugging or wiring in machine to electrical circuit. 

Warranty will be void if machine is connected to any voltage other than that specified on the name plate. 

 

 

Depending on the particular model, this brewer may be hooked up to either a 120/240V ac single phase circuit 

or a 120/240V ac three phase delta circuit. Refer to the brewer name plate on back of brewer. The pictorial view at the 
bottom of this page illustrates the power cord connection to the terminal block for both circuits. A wiring diagram at the 
rear of this manual illustrates the complete brewer wiring. Note that the tank heater system is the only portion of the 
brewer running on 240V. The balance of components are powered by 120V obtained by tapping one leg, L1, of the 
circuit. 
 
To attach power cord or conduit: 
 
1)  Remove the front access panel covering terminal block area by removing the four retaining screws. 
 

Locate the strain relief connector on rear of unit and loosen the connectors two screws.  

 
3)  Feed appropriate power cord/conduit through the strain relief connector until wire leads reach the terminal block in  

front of brewer. 

 
4)  Make electrical connections as shown at the bottom of this page and on the wiring diagram at the rear of this 

manual. Before attaching leads to terminal block, turn screws on the bottom face of terminal block and on the earth 
ground connector fully counter clockwise to insure that the receiver for leads is fully open. Hold lead in place and 
tighten by turning screws fully clockwise. Tighten strain relief on rear of unit. 

 

 

 
 
 
 
 
 
 
 
 
 

 
 
 

Summary of Contents for GXDF-8D

Page 1: ...15 2 19 19 1 8 21 3 8 13 5 24 9 Single GXDF2 30 2 19 19 1 8 26 5 8 14 0 25 4 Single GXDF 8D N A 19 19 1 8 30 3 4 11 5 22 9 Single GXDF 8D N A 19 19 1 8 30 3 4 N A 25 3 Three delta Shipping weight is approximately 65 pounds for all above units Height does not include the 4 adjustable legs Add approximately 4 to the height shown when using these legs NOTE Automatic models without faucet are also ava...

Page 2: ...trol center to alert the user that a brew cycle has either been initiated or is in process and to use caution This feature also has a calibration adjustment on the control board which allows for the calibration to continue the light flashing until the coffee completely drains from the brew basket Note A new brew cycle will not be accepted until the Visa Light stops flashing This design eliminates ...

Page 3: ...her a 120 240V ac single phase circuit or a 120 240V ac three phase delta circuit Refer to the brewer name plate on back of brewer The pictorial view at the bottom of this page illustrates the power cord connection to the terminal block for both circuits A wiring diagram at the rear of this manual illustrates the complete brewer wiring Note that the tank heater system is the only portion of the br...

Page 4: ... position momentarily until the fill cycle begins and then turned back When the tank reaches the preset temperature the fill portion of the brew cycle will begin The tank lid must be in place for proper unit operation When water begins to flow from brew basket the brew cycle may be canceled by depressing the brew start stop switch Allow water to finish draining from the unit and then empty the con...

Page 5: ... at the start of the brew cycle and when the decanter is half full Recommended temperature of the water is approximately 195 F Note Brew cycle may be canceled by depressing the brew start stop switch The brewer features an electronic temperature control circuit and the temperature may be adjusted with the control board located behind the right side access plate See Figure below for control board s...

Page 6: ...should continue to flash until all the liquid has finished flowing from the brew basket Do not remove decanter until the brewing process has stopped and all liquid has stopped flowing from the brewbasket 10 The resultant coffee brew should be crystal clear and have the desired properties attainable through excellent extraction 11 To clean brew basket simply remove from brew rails and dump filter i...

Page 7: ...7 FACE PLATE DIAGRAM MODEL GXDF 8D WIRING DIAGRAM Newco Enterprises Inc 1735 South River Rd P O Box 852 St Charles MO 63303 ...

Reviews: