![Newage 2 Door Cabinet Manual Download Page 38](http://html1.mh-extra.com/html/newage/2-door-cabinet/2-door-cabinet_manual_1678388038.webp)
Unpacking
• Begin by placing the package on a covered flat surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below.
Handles
Handle Bolts (M4 x30mm)
3
6
3 Drawer
Cabinet
6
#8 x 25mm Screws
Threaded Washer
Threaded Caps
Lag Screw ( 6 mm x 55 mm)
4
4
4
Parts Supplied
Handle
Handle Bolt
M4 x 30mm
Tools Needed
1 x
Tape Measure
1 x
#2 Phillips Bit
(opitional)
1 x
Pencil
1 x
Cordless Power Drill
(optional)
1 x
#2 Phillips head
screwdriver
1 x
Flashlight
(optional)
1 x
Drill Bit
2.5mm or 3/32”
Screws
#8 x 25mm
Lag Screw
6mm x 55mm
Threaded
Washer
Threaded
Washer