- 53 -
NL345
www.NewLeader.com
(800) 363-1771
312884-AA-C
Header
1� Make sure unit has been properly serviced and is in good operating condition� It is recommended to
run the spreader prior to loading material to ensure acceptable operation�
2� Set manual machine settings in controller per Controller section in this manual�
3� Program controller with correct data for material and application�
4� Adjust feedgate to appropriate setting�
5� Adjust spinner to give spread pattern desired� See “Spread Pattern” and “Controller” sections for
details� Calibrate and spread pattern test for any new material�
6� Fill unit with material to be spread�
7� Engage hydraulics�
8� Begin spreading�
CAUTION
Drive only at speeds which permit good control of vehicle!
NOTICE!
CHANGE HYDRAULIC OIL FILTER AFTER FIRST WEEK (OR NOT MORE THAN 50 HOURS) OF
OPERATION ON A UNIT�
General Operating Procedures
Summary of Contents for NL345/MULTAPPLIER
Page 6: ...Insert Current New Leader Warranty Warranty...
Page 26: ...26 www NewLeader com 800 363 1771 312884 AA C NL345 Informational Decals 1 1...
Page 86: ...86 www NewLeader com 800 363 1771 312884 AA C NL345 Header Hydraulic Schematic TR3000 Brakes...
Page 114: ...114 www NewLeader com 800 363 1771 312884 AA C NL345 Notes This Page Intentionally Left Blank...