5 - TRANSPORT OPERATIONS
Preparing for road transport
Tie downs for shipping
1.
Set the machine in the position for transport: fully
retract the arm and curl the bucket slowly.
2.
Lower the dozer blade.
3.
Check the overall height between the ground and the
highest point of the machine and check the overall
width of the machine. Make sure to be within the size
limits defined before transport.
4.
Set the safety lever to the LOCK position.
5.
Turn off the engine and remove the starter key.
6.
Get off the machine.
7.
Insert the boom swing locking pin.
8.
Use the starter key to close and secure the cab door,
the engine hood, the tool box, and the service door.
9.
Check the condition of the tie-down points on the
trailer.
10. Secure the machine onto the trailer using chains
(A)
to prevent the machine from swaying (oscillation) dur-
ing transport.
SMIL16MEX0585AA
1
11. Carry out a final check of the tie-down condition.
12. If a rear loading type trailer is used for road transport,
lift or remove the loading ramps.
13. Remove blocks from the tires of the trailer.
5-3
Summary of Contents for E57C
Page 8: ......
Page 194: ...4 OPERATING INSTRUCTIONS 4 30 ...
Page 202: ...5 TRANSPORT OPERATIONS 5 8 ...
Page 228: ...6 MAINTENANCE To grease the blade refer to page 6 36 6 26 ...
Page 302: ...7 TROUBLESHOOTING 7 4 ...
Page 305: ...8 SPECIFICATIONS Track shoes steel 40 8 3 ...
Page 370: ...9 ACCESSORIES 9 62 ...