New England Arbors Westchester Arbor Assembly Instructions Download Page 4

STEP THREE

Move the side panels to their final location (you will need a helper). 

 

When you have identified the location of each post, as indicated  

by the measurements on the first page of these instructions,  

mark the positions of the posts, then move the panels aside.   

 

Excavate four holes approx 33” deep. The location and excavation  

of these four holes is the most critical step and should be  

completed with care. The depth of these holes will allow the  

post extension joint to be hidden 3” under the ground. 

 

Carefully move the side panels back into position and level  

both horizontal and vertically.  

  

Check your measurements to confirm posts are placed  

correctly to receive arch system.  THIS IS A CRITICIAL STEP. 

 

 

 

Install the Side Panels 


www.newenglandarbors.com 

Arbors must be well secured to prevent tipping over from

wind load, etc.  Below we have provided two options for you

to extend the posts and mount into a concrete footing.

Into Earth with Concrete Footing  (Option One) 

(Assuming posts have been extended) 

 

* Do not backfill the holes with cement at this stage. 

 

4

The Westchester Arbor

You have Three Options to Complete this Step.     

                                        (All purchased separately) 
 

OPTION ONE  -  

If Your Arbor: 

    •  is going to be installed with fencing or a gate 
    •  is located in a high wind or hurricane area  
    •  is located in ground conditions that are not level 

 Consider Using: 

  A - 5x5 Professional Post Extension Kit  (30” long), (Kit of 4)  

    •  Purchase from New England Arbors, www.newenglandarbors.com 
    •  Recommended to be installed in concrete footings 
    •  Follow instructions included with the kit 

            - or -  

  B - 4 x 4 x 32” Long Wood Post  (4) 

    •  Purchase separate from your local lumberyard 
    •  Recommended to be installed in concrete footing 

 

 OPTION T WO -

 If Your Arbor: 

    •  is intended to be used as a stand alone garden accent or pathway  
    •  is located on level ground 

 Consider Using: 

    •  Purchase from New England Arbors, www.newenglandarbors.com 
    •  Instructions are included with the kit 

 

OPTION THREE - 

If Your Arbor: 

    •  is going to be installed onto pre-existing concrete or wood surface 

 Consider Using: 

   5 x 5 Surface Mount Kit  

    •  Purchase from New England Arbors, www.newenglandarbors.com 
    •  Follow instructions included with the kit 
 

 

 

 

 

 

 

 

   

(Posts have been extended with 5x5 Professional Post Extension Kit) 

3

33 

10 

2

50 

22 

Level 

(Measurements shown are inside to inside of posts)

5” EZ Mount Post (Package of 4)

Summary of Contents for Westchester Arbor

Page 1: ...ls You Will Need Hammer Tape Measure Level Stool or Short Ladder Shovel or Auger Cordless Drill General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 10 x 8 for unobstructed assembling You should not need to use excessive force when assembling comp...

Page 2: ...ill lock into place Fit opposite arch system over rafters The Westchester Arbor Assemble the Arch System 1 1 2 3 4 5 www newenglandarbors com 3 6 7 STEP TWO Layout the horizontal bottom rail and insert the four vertical spindles Slide the five horizontal spindles over the four vertical spindles Slide the horizontal top rail over the spindles to complete the side panel Set out one post and complete...

Page 3: ...ntal top rail over the spindles to complete the side panel Set out one post and complete the side panel by aligning and inserting the horizontal spindles and rails into the post Layout the second post with holes facing upwards and insert the completed panel Repeat for other panel Assemble the Side Panels 1 2 3 4 5 6 1 2 3 4 5 NOTE Orientate the pre drilled screw holes on the posts correctly when a...

Page 4: ...is stage 4 The Westchester Arbor You have Three Options to Complete this Step All purchased separately OPTION ONE If Your Arbor is going to be installed with fencing or a gate is located in a high wind or hurricane area is located in ground conditions that are not level Consider Using A 5x5 Professional Post Extension Kit 30 long Kit of 4 Purchase from New England Arbors www newenglandarbors com R...

Page 5: ...ndarbors com STEP FIVE Ensure that posts and side panels are level Fill around the posts with wet cement within 3 of your natural elevation Complete a final level check both horizontally and vertically and backfill the remaining space between concrete and natural elevation with topsoil Fill Excavated Holes 3 4 5 5 Toll Free Phone 1 800 282 9346 Toll Free Fax 1 877 464 9286 www newenglandarbors com...

Reviews: