New England Arbors Westchester Arbor Assembly Instructions Download Page 1

Check Box for These Contents 

In the event of missing or defective parts please call our customer service dept. at 1 800 282 9346 (Mon. to Fri. 8:00 AM to 4:00 PM EST).

    1.  Arch Keystones with Inserts(2)

    2.  Keystone Bottom Plate (2)

    3.  Arches (4)

    4.  Arch Rafters (8)

    5.  Side Panel Horizontal Rails (4)

    6.  Post Caps (4)

    7.  Posts (4) 

    8.  Side Panel Vertical Spindles (8)

    9.  Side Panel Horizontal Spindles (10)

    10.  #8 x 2 1/2“ Stainless Steel Screws (24)

Tools You Will Need

    •  Hammer 

    •  Tape Measure

    •  Level 

    •  Stool or Short Ladder

    •  Shovel or Auger

    •  Cordless Drill  

General Information

    •  Read Instructions through carefully before beginning assembly.

    •  When assembling components, place on a non-abrasive surface

       (i.e. shipping box) to avoid scratching. 

    •  We recommend an area approx 10’x 8’ for unobstructed assembling.

    •  You should not need to use excessive force when assembling components.

The Westchester Arbor

Please read through before starting assembly.

ASSEMBLY INSTRUC TIONS

10

5

9

8

7

1

www.newenglandarbors.com

6

4

2

1

90 in

50 in
60 in

65.5 in

97.125 in

22 in
32 in

(Not to scale)

3

V1.4/121118

Summary of Contents for Westchester Arbor

Page 1: ...ls You Will Need Hammer Tape Measure Level Stool or Short Ladder Shovel or Auger Cordless Drill General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 10 x 8 for unobstructed assembling You should not need to use excessive force when assembling comp...

Page 2: ...ill lock into place Fit opposite arch system over rafters The Westchester Arbor Assemble the Arch System 1 1 2 3 4 5 www newenglandarbors com 3 6 7 STEP TWO Layout the horizontal bottom rail and insert the four vertical spindles Slide the five horizontal spindles over the four vertical spindles Slide the horizontal top rail over the spindles to complete the side panel Set out one post and complete...

Page 3: ...ntal top rail over the spindles to complete the side panel Set out one post and complete the side panel by aligning and inserting the horizontal spindles and rails into the post Layout the second post with holes facing upwards and insert the completed panel Repeat for other panel Assemble the Side Panels 1 2 3 4 5 6 1 2 3 4 5 NOTE Orientate the pre drilled screw holes on the posts correctly when a...

Page 4: ...is stage 4 The Westchester Arbor You have Three Options to Complete this Step All purchased separately OPTION ONE If Your Arbor is going to be installed with fencing or a gate is located in a high wind or hurricane area is located in ground conditions that are not level Consider Using A 5x5 Professional Post Extension Kit 30 long Kit of 4 Purchase from New England Arbors www newenglandarbors com R...

Page 5: ...ndarbors com STEP FIVE Ensure that posts and side panels are level Fill around the posts with wet cement within 3 of your natural elevation Complete a final level check both horizontally and vertically and backfill the remaining space between concrete and natural elevation with topsoil Fill Excavated Holes 3 4 5 5 Toll Free Phone 1 800 282 9346 Toll Free Fax 1 877 464 9286 www newenglandarbors com...

Reviews: