background image

5

4

M

ove the trellis to its final location.  

W

hen you are satisfied with

the location

,

 mark the positions of the posts

,

 then move the trellis

aside and lay it carefully on it

s side.  E

x

cavate the 2 post holes

appro

xim

at

ely 12" [30.5cm] deep x 6" [15.2cm] diame

ter.  

Carefully move the trellis 

back i

nto position.

Level it 

b

oth vertically and horizontally into the e

x

cavated holes.

Backfill the holes with the e

x

cavated soil.

Note:

 For a stronger installation

,

 purchase two 2

x4 [35mm x

 90mm equivalent] pressure treated lum

b

ers and sleeve them

 into the posts. 

W

ood posts should 

b

e inserted 4” [10.2 cm] into the

trellis posts and ±24”  [61 cm] into the ground.

A

B

C

Mounting Into the Ground

Trellises must be well secured in the event of high winds, etc.  We 
have provided two ground 

mounting extensions

  for  securing  the  

trellis

 

either  into   the   ground  or   into  a   concrete   footing.    If 

you are installing your trellis directly to the wall of your home, or on a 
wood deck or concrete surface, please see your hardware store for the 
appropriate galvanized bracket hardware.

STEP FOUR

Install the Ground 

Mounting Extensions

Insert the ground 

mounting extensions

 into the 

b

ottom of the 

trellis

 

posts.  Secure with screws as shown aside.

STEP FIVE

Install Trellis into Ground

A

5

12” 

30.5cm

Level

6“

15.2 cm

B

C

www.newenglandarbors.com

www.newenglandarbors.co

.uk

North America Toll Free Phone: 

1 800 282 9346

 

United Kingdom 

Tel: (44) 2038 687160 

Summary of Contents for Vienna

Page 1: ... Extensions 2 10888 15 1 1 2 38 mm Self Auguring Stainless Steel Screws 20 20005 Tools You Will Need Cordless Drill Hammer Tape Measure Level Shovel General Information Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 5 x 8 1 5mx2 4m for unobstructed assembling Y...

Page 2: ...notched ends are fully inserted into the top bottom rails just past the notched ends Note the difference between the two rails The bottom rail only has one routed side whereas the top rail has additional holes for the arch spindles Align and insert the rails into one of the post Note that the pre drilled holes are located on the back side of the trellis Proceed with the other post Flip the trellis...

Page 3: ...he arches will be marked with a sticker where they meet the keystone Using two of the provided screws fasten the arches into the keystone insert as shown Drive two more screws to the underside of the keystone Snap the top and bottom lid to complete the arch assembly Arch Assembly 1 Insert first 2 3 4 1 2 3 4 Sticker Sticker The Vienna Trellis ...

Page 4: ... rail as shown The short spindles would be on the outer side of the rail and the long spindles would be on the inner side of the rail Starting on one end guide the arch assembly and arch spindles into the pre routed holes as shown Fasten the arch assembly to the posts using four screws 2 per post provided Arch Assembly 1 2 3 4 1 Long 2 Long Short Short 3 4 The Vienna Trellis ...

Page 5: ...posts and 24 61cm into the ground A B C Mounting Into the Ground Trellises must be well secured in the event of high winds etc We have provided two ground mounting extensions for securing the trellis either into the ground or into a concrete footing If you are installing your trellis directly to the wall of your home or on a wood deck or concrete surface please see your hardware store for the appr...

Reviews: