![New England Arbors Mayfair Raised Planter Box Assembly Instructions Download Page 3](http://html.mh-extra.com/html/new-england-arbors/mayfair-raised-planter-box/mayfair-raised-planter-box_assembly-instructions_1677346003.webp)
The Mayfair Raised Planter Box
Layout and arrange the floor boards as shown and insert them
one by one starting with either of the shorter floor board.
The boards will be labelled 1 through 6.
For optimal support, insert the boards perpendicular to the
floor support as shown.
Pressure fit the post caps into place. Push until the caps lock into
place.
3
2
S T E P T W O
Place the floor support onto the support rail as shown.
Note the notches and the orientation of the floor support.
1
www.newenglandarbors.com
3
1
2
1 2
3 4 5 6
Toll Free Phone: 1 800 282 9346 Toll Free Fax: 1 877 464 9286
www.newenglandarbors.com
3