New England Arbors Dublin Assembly Instructions Download Page 4

4

North America Toll Free Phone: 1 800 282 9346 

United Kingdom Tel: (44) 2038 687160 

www.newenglandarbors.com 

www.newenglandarbors.co.uk

STEP THREE

Connect Arch System to Side Panels

 Set out 

b

oth side panels 42 in. (

10

7

 cm

) opening 

b

etween 

inside  of posts.

Place the assem

b

led arch over the side panels and push down until

the post tops 

b

ottom out inside the post caps.  

Y

ou will need a

helper for this step.

1

2

3

2

3

      42 in.

10

7

 c

m.

Move the ar

b

or to its final location (

y

ou will need a helper).

 

W

hen 

y

ou are satisfied with the location

,

 mark the locations of

 

the posts

,

 

then move the ar

b

or aside and la

y

 it carefull

y o

n its side.

 

E

x

cavate 4 

holes appro

x

.

 10

” 

(25 cm) 

deep. Caref

ully

 move the ar

bor ba

ck

 

into 

position and level it 

b

oth verticall

and horizontall

y

.

Backfill the holes with the e

x

cavated soil to cover the 

extensions 

.

1

A  

 Into Earth (temporary Installation)

2

Similar to the a

b

ove steps

,

 move the ar

b

or to its final location.

 

W

hen 

y

ou are satisfied with the location

,

 mark the locations of 

the posts

,

 then move the ar

b

or aside and la

y

 it caref

ully

 on its side.

 

E

x

cavate 4 holes appro

x

. 18”

 (46 cm)

 deep

,

 6“ 

(15 cm) 

diameter.

 

F

ill the holes with wet cement flush to the ground. 

Y

ou will need

2 bag

s of pre-m

ix 

concrete (purchase separatel

y

). Careful

ly

 move

the ar

bor ba

ck into position.

Support the ar

b

or and level over the holes with

 b

ricks

,

 stones or

b

locks of wood under the 

b

ottom rail of the side panel. The

 

post 

b

ottoms should insert themselves appro

x

imat

ely 1

” 

(1.5 cm) 

into

 

t

he concrete. Allow the concrete to set.

1

2

3

B  

 Into Earth With Concrete Footing

A

1

1

0

" (25 cm)

6"

(15 cm)

2

Level

Level

Slide the four ground 

mounting extensions

 into the 

b

ottom 

of

 

each posts until it 

b

ottoms out and secure with two 

screws

,

 one on the outer side of the post and one on the 

inner side

 

as shown.

1

F

asten the a

ssembled a

rch s

y

stem to the posts 

by

 installing two 

5/8 in. (16 

m

m.) screws into the two pre-drilled holes provided on 

the 

b

ottom of each post cap as illustrated.

STEP FOUR

Arbor Installation

     Arbors must be well secured to prevent tipping over from wind load, 

etc.  We have provided four ground 

m

ounting extensions

 for 

securing the arbor in

 

a temporary application like a wedding, etc.  

These 

e

xtensions

 are not designed to permanently mount your 

arbor. If you are installing your

 

arbor on concrete or a wood deck, visit 

your hardware store to

 

 purchase the appropriate galvanized 

bracketing hardware.

 

Ground Mounting Extension

 Installations

1

1

B

18

" (46 cm)

6

"   (15 cm)

Summary of Contents for Dublin

Page 1: ...tion Read Instructions through carefully before beginning assembly When assembling components place on a non abrasive surface i e shipping box to avoid scratching We recommend an area approx 10 ft x 8 ft 3 m x 2 4 m for unobstructed assembling You should not need to use excessive force when assembling components Please read through before starting assembly IMPORTANT CHECK THE INSIDE OF YOUR POSTS ...

Page 2: ...ost caps at bottom of arch Fig 2 and repeat for other arch Insert arch rafters 6 into the holes on the arches until they bottom out inside the arches There are locking tabs located at each end of the rafters that once inserted into the holes will lock into place The Dublin Arbor Arch Assemble the Arch System 3 3 4 1 1 Fig 2 2 Fig 1 2 PLEASE NOTE Arch rafters have locking tabs located at both ends ...

Page 3: ...to place the two outer vertical spindles The assembled side panel will need to be held together until it is inserted into the post Lay out one LEFT post as identified horizontally with holes facing up and insert the assembled side panel by aligning the horizontal rails with the holes on the post Lay out one RIGHT post as identified horizontally with holes facing up and insert the assembled side pa...

Page 4: ...the holes with wet cement flush to the ground You will need 2 bags of pre mix concrete purchase separately Carefully move the arbor back into position Support the arbor and level over the holes with bricks stones or blocks of wood under the bottom rail of the side panel The post bottoms should insert themselves approximately 1 1 5cm into the concrete Allow the concrete to set 1 2 3 B Into Earth Wi...

Reviews: