![New Age 3 DRAWER BASE HOME BAR Manual Download Page 75](http://html1.mh-extra.com/html/new-age/3-drawer-base-home-bar/3-drawer-base-home-bar_manual_1676964075.webp)
Unpacking
• Begin by placing the package on a covered flat surface.
• Remove all cardboard, foam packaging material and clear plastic bags.
• Dispose / recycle all packaging materials.
• Verify all the contents in the box and gather the required tools. See “Parts” and “Tools Needed” in the list below.
Door Handles
Drawer Handles
Shelf Clips
Shelf
Handle Bolts for Doors (M4x22mm)
Handle Bolts for Drawers (M4x30mm)
#8 x 25mm Screws
2
2
1
1
4
6
6
Split
Cabinet
Parts Supplied
Door Handle
Tools Needed
1 x
Tape Measure
1 x
#2 Phillips Bit
(opitional)
1 x
Pencil
1 x
Cordless Power Drill
(optional)
1 x
#2 Phillips head
screwdriver
1 x
Flashlight
(optional)
1 x
Drill Bit
2.5mm or 3/32”
Drawer Handle
Shelf Pins
Door
Handle Bolt
M4 x 22mm
Drawer
Handle Bolt
M4 x 30mm
Screws
#8 x 25mm
Shelf