NEUTRIK NAC3FX Operating & Assembly Instruction Download Page 2

ASSEMBLY INSTRUCTION

  

powerCON TRUE1

I  

R

Draft. Nr.: BDA 290  

/ 3102M1891      

Update:

14.05.2012

      

I

I

Data subject to change without prior notice.  2012  NEUTRIK  . ALL RIGHTS RESERVED.

®

©

www.neutrik.com

NEUTRIK

  

AG

LI

T: 

+423

 

/

 

237

 

24

 

24

F: 

+423

 

/

 

232 53 93

NEUTRIK

  

USA Inc.

USA

T: 

+1

 

732

 

/

 

901

 

9488

F: 

+1

 

732

 

/

 

901 9608

(

)

NEUTRIK

  

UK  Ltd.

UK

T: 

+44

 

1983

 

/

 

811

 

441

F: 

+44

 

1983

 

/

 

811

 

439

NEUTRIK 

Vertriebs

 

GmbH

DE

 

/

 

NL

 

/

 

AT/DK

T: 

+49

 

8131

 

/

 

280

 

890

F: 

+49

 

8131

 

/

 

280

 

830

NEUTRIK France

FR

T: 

+33 1 / 4131 6750

F: 

+33 1 / 4131 0511

NEUTRIK Tokyo Ltd.

JP

T: 

+81 3 / 3663 4733

F: 

+81 3 / 3663 4796

NEUTRIK 

Hong Kong Ltd.

HK

T: 

+852 / 2687 6055

F: 

+852 / 2687 6052

R

Page 2

Disassembly (open twist lock):

1.

 Press with screw driver to unlock 

2.

 Turn bushing while still pressing locking.

(at 

 )

q

E

D

C

Slide the cable into the contacts and clamp with 
the screw.

Wiring

VDE

UL

Slide insert and chuck into housing.

Slide the cable clamp bushing up the cable and  
tighten it with the tool as shown.
(Tool available: Art. No. HTAC)

 

brown

black

N

 

blue

white

   

 

green

 

/

 

yellow

green

Þ
Þ
Þ

Important: Align the chuck by positioning the 
nose into keyway.

4.

5.

Torque Value 2.0Nm

PRESS FIRMLY

3.

1.

2.

Wrench size

10 mm

1.

2.

Torque Value 0.7 Nm

Reviews: