Network Critical CriticalConneX CC2100 User Manual Download Page 2

CriticalConneX™ User Guide - CC2100

Page 2

Introduction

This user guide shows you how to install the CC2100 into your Multi-mode Fiber or

Copper Gigabit network.

Inspect Package

Remove the TAP and accessories from the shipping box. Make sure you received these

items:

1 x CC2100: 1x4 Gigabit Multi-mode Fiber or Copper Gigabit CriticalTAP™ with 4

Copper Gigabit Monitoring Ports

2 x Power Cords

1 x Console Cable: DB9M to DB9F, 10' Straight Through Cable

Note:

If any items are missing or damaged in shipping please inform us immediately.

Operational Status

Indicators

Multi-mode Gigabit

Fiber LAN Ports (LC)

Port Status Indicators

Yellow = 1000 mbps

Link/Activity

Gigabit Copper

LAN Ports

Programmable

Monitor Ports

Front Panel

Rear Panel

Console Port

Power Inlets

Reviews: