Installation
11
1. Press the NKK against the container wall
so that the glue strips seal the gap be-
tween the NKK and the container wall.
Sealing by pressing
1. Open the cartridge and unscrew the static
mixer.
2. Insert the cartridge with static mixer into
the appropriate dispensing applicator.
3. Discard the first 1-2 ml of the glue strand
in the 50 ml cartridge or the first 10 ml in
the 400 ml cartridge.
Dispensing applicator, cartridge and
static mixer
1. Fill the glue in the drill holes of the NKK. If
vertically mounted, start in the middle of
the NKK at the bottom.
2. Add glue to each drill hole until glue
emerges from at least one other drill hole.
3. Remove the discharged adhesive.
The static mixer should be replaced if the
application is interrupted for more than
5 minutes at 23 °C.
Glue in drill holes
The NKK are ready for use after 12 hours.
This applies for temperatures from 15 °C to
40 °C.
The curing time of the glue is shorter at high-
er temperatures.
Glued NKK
Pre-glueing
Preparing glue
Filling in glue
Allowing glue
to cure