background image

7.  Slide the equipment onto the telco tray until the brackets on the chassis meet the rack posts, and then secure the brackets to

the rack posts with six of the appropriate size and type mounting screws matching the threading of your rack.

8.  If applicable, replace the end caps.

9.  See the appropriate installation or upgrade guide to complete the setup of the new shelf.

Documentation can be found on the NetApp Support Site.

mysupport.netapp.com > Documentation > A-Z Documentation

 

 

Installing 2U equipment into a two-post rack

3

Reviews: