
Citiz service manual
96
R E P A I R S
Assembly checkpoints
•
The left and right button prints (42) are marked with "L" or "R" for easy identification.
•
After assembly check the plug arrangement of the mainboard (see “Wiring
diagrams” on page 97 and following).
•
Lay connection wires to button prints in brackets and cable guides like shown.
12
42
For installing and
connecting a new
electronic control
board, the service techni-
cian must be earthed with
a grounding band.
Summary of Contents for EF 451 C 111
Page 19: ...Citiz service manual 19 T E C H N I C A L D A T A Rating plates Citiz machine partners...
Page 20: ...Citiz service manual 20 T E C H N I C A L D A T A Rating plates Citiz milk machine partners...
Page 118: ...Citiz service manual 118 E X P L O S I O N D R A W I N G S...
Page 121: ...Citiz service manual 121 E X P L O S I O N D R A W I N G S 10 3 Model Citiz EF 452 D111...
Page 122: ...Citiz service manual 122 E X P L O S I O N D R A W I N G S...
Page 125: ...Citiz service manual 125 E X P L O S I O N D R A W I N G S 10 5 Model Citiz EF 467 C121...
Page 126: ...Citiz service manual 126 E X P L O S I O N D R A W I N G S...
Page 129: ...Citiz service manual 129 E X P L O S I O N D R A W I N G S 10 7 Model Citiz EF 468 D121...
Page 130: ...Citiz service manual 130 E X P L O S I O N D R A W I N G S...
Page 133: ...Citiz service manual 133 E X P L O S I O N D R A W I N G S...