INSTALLATION
Unpacking
Open all boxes supplied and check the contents with the enclosed packing
list. Inspect units and parts for possible transport damage.
Installing the Above Decks Equipment (ADE)
Preparations
The ADE heading is marked on the radome. As assembled at the
factory, the access hatch is at the aft end. The horizontal orientation of the
antenna inside the radome can be adjusted at the factory prior to dispatch,
if so specified. The heading of the pedestal itself is where the coaxial cable
runs out of the post.
Installation on the
The ADE is furnished with lifting lugs attached to four of the eight
antenna mast
bolts on the radome, see figure below.
Attach straps or slings to the lifting lugs and hook them on to the crane
hook. (Note! Straps are not part of the delivery).
Remove the straps fastening the radome to the transport pallet.
Carefully start lifting the ADE.
WARNING!
Personnel must not pass underneath the ADE during hoisting
operations.
Place the neoprene gasket on top of
the steel flange, or preferably
threaded onto the radome
bolts. Manoeuvre the ADE
into position directly
above the mast flange
before lowering it al-
most down to the flange.
WARNING!
Watch your hands!
Install the ADE with the
heading mark pointing
forward.
Align the bolts extending
down from the bottom
with the holes through
the mast flange, and
lower the unit gently
until it rests on the mast.
Secure the ADE to the
mast flange using the
enclosed toothed wash-
ers and nuts. Tighten the
nuts applying a torque of
100 Nm.
Finally, remove the lifting
straps and the straps retain-
ing the antenna platform
inside radome during trans-
port.
Neoprene
gasket
LIFTING
STRAPS
Saturn B
To obtain good grounding,
remove paint from mast
in areas where nuts are
fastened to secure antenna
and radome. Use toothed
washers included.
Lifting
lug
Toothed
washer
Nut
Summary of Contents for Saturn BM Marine
Page 1: ...Saturn Bm Marine Class 2 Installation Manual...
Page 55: ......