N21
Hardware User Guide
Copyright © Neoway Technology Co., Ltd. All rights reserved.
30
If the module is exposed to air for more than 48 hours at conditions not worse than 30°C/60% RH,
bake it at a temperature higher than 90 degree for more than 12 hours before SMT.Or, if the indication
card shows humidity greater than 20%, the baking procedure is also required.Do not bake modules
with the package tray directly.