Neoray S23DW Installation Instructions Download Page 3

TM

100 Andrews Rd, Hicksville, NY 11801 • p: 516-470-1000 • f: 516-470-1077 • www.neoray-lighting.com

Page 3 of 3

Document P/N: 23DW02

S23DW CONTINUOUS INSTALLATION INSTRUCTIONS

Carriage Bolt

Aligner Pin

BOR Section

Bulkhead Opening

Joiner Nut

INT Section

11. SPLICE RUN THROUGH WIRES.

     BEND TRAYS UP. FIX WITH 8-32 

     MACHINE SCREWS.

13. INSTALL LAMPS.

14. CHECK FIXTURE FUNCTION.

15. INSTALL LENSES.

9. CONNECT INT FIXTURE TO INSTALLED BOR FIXTURE

    BY CARRIAGE BOLT THROUGH HOLE IN BLACKHEAD 

    OF INT FIXTURE, PUT NUT ON A FEW THREADS.

10. INSERT ALIGNER PINS INTO ADJACENT HOUSING OF

    INT FIXTURE GROOVES.

12. REPEAT STEPS FROM

      7 THROUGH 11 TO 

       CREATE RUN.

10. WITH SUPPORT INT FIXTURE 

TIGHTEN JOINER NUT.

Reviews: