![Neoray S23DW Installation Instructions Download Page 3](http://html1.mh-extra.com/html/neoray/s23dw/s23dw_installation-instructions_719443003.webp)
TM
100 Andrews Rd, Hicksville, NY 11801 • p: 516-470-1000 • f: 516-470-1077 • www.neoray-lighting.com
Page 3 of 3
Document P/N: 23DW02
S23DW CONTINUOUS INSTALLATION INSTRUCTIONS
Carriage Bolt
Aligner Pin
BOR Section
Bulkhead Opening
Joiner Nut
INT Section
11. SPLICE RUN THROUGH WIRES.
BEND TRAYS UP. FIX WITH 8-32
MACHINE SCREWS.
13. INSTALL LAMPS.
14. CHECK FIXTURE FUNCTION.
15. INSTALL LENSES.
9. CONNECT INT FIXTURE TO INSTALLED BOR FIXTURE
BY CARRIAGE BOLT THROUGH HOLE IN BLACKHEAD
OF INT FIXTURE, PUT NUT ON A FEW THREADS.
10. INSERT ALIGNER PINS INTO ADJACENT HOUSING OF
INT FIXTURE GROOVES.
12. REPEAT STEPS FROM
7 THROUGH 11 TO
CREATE RUN.
10. WITH SUPPORT INT FIXTURE
TIGHTEN JOINER NUT.