17
Preconditions for Installation
Room
Equipment is designed for use in indoor
conditions.
Ventilation is
recommended, as in the working regime
the machine creates salt aerosol.
Doors must be wide at least 80 cm.
Power
Power cord material at least
3 x 2,5 mm²
copper crosscut.
Power cord should be connected into the
moisture proof junction box which is located
on the equipment frame.
Otherwise connect the plug to a socket, if
the plug was already included in the
equipment in the factory.
Maximum power consumption for equipment
at a time is
0,3 kW
.
Protective device current in front of
equipment feeder not less than
10mA.
Legend for picture 1
Area for the main cable 3x2,5 mm² with free cable-end of minimum 2,0 m and the earth-
connection cable 4mm² with free cable-end of minimum 2,0 m
Summary of Contents for Saltarium
Page 1: ...NEOQI Saltarium ENG...
Page 2: ......
Page 3: ...3 Thank you for choosing NeoQi...
Page 7: ...7 TREATMENTS HERAPIES AFFECTS HALOTHERAPY 49 MUSIC THERAPY 50...
Page 8: ...8...
Page 9: ...9 1 Preconditions Set up...
Page 10: ...10...
Page 12: ...12...
Page 14: ...14...
Page 16: ...16...
Page 18: ...18...
Page 27: ...27 Introduction Cautions 2...
Page 28: ...28...
Page 33: ...33 Getting Started Using Your Cocoon 3...
Page 34: ...34...
Page 47: ...47 4 Treatments herapies Affects...
Page 48: ...48...