
NeoPAC
- 37 -
If your installation is equipped with water treatment devices (chlorine, brome feeder, salt water
chlorine generator, others) the by-pass must be installed before the water treatment devices,
with a non-return check valve between the by-pass and water treatment devices.
Water inlet and outlet are designed to be connected to rigid pressure PVC tube (for swimming
pool) Ø50 mm, directly glued to the half union connectors provided.
Inlet water tube must be connected to connection labelled:
Outlet water tube must be connected to connection labelled:
Water tubes must be fixed on the floor or the walls, so the heat pump will not support the
weight of the water inside the plumbing.
Summary of Contents for 06
Page 1: ...NeoPAC Handbook NeoPAC 2012 rel 12 4 05 2012 P 3 P 29 P 53 P 77 ...
Page 2: ...NeoPAC 2 ...
Page 3: ...NeoPAC 3 NeoPAC 06 08 10 12 15 ...
Page 4: ...NeoPAC 4 ...
Page 25: ...NeoPAC 25 Dimensions ...
Page 27: ...NeoPAC 27 NEOPAC08 10 12 NEOPAC15 ...
Page 28: ...NeoPAC 28 ...
Page 29: ...NeoPAC 29 NeoPAC 06 08 10 12 15 ...
Page 30: ...NeoPAC 30 ...
Page 50: ...NeoPAC 50 Dimensions ...
Page 52: ...NeoPAC 52 NEOPAC08 10 12 NEOPAC15 ...
Page 53: ...NeoPAC 53 NeoPAC 06 08 10 12 15 ...
Page 54: ...NeoPAC 54 ...
Page 73: ...NeoPAC 73 Dimensiones ...
Page 75: ...NeoPAC 75 NEOPAC08 10 12 NEOPAC15 ...
Page 76: ...NeoPAC 76 ...
Page 77: ...NeoPAC 77 NeoPAC 06 08 10 12 15 ...
Page 78: ...NeoPAC 78 ...
Page 97: ...NeoPAC 97 Abmessungen ...
Page 99: ...NeoPAC 99 NEOPAC08 10 12 NEOPAC15 ...
Page 100: ...NeoPAC 100 ...