Commissioning Cycle
•
Function test
•
Self-test
A tri-colour LED indicator displays the light fitting status. The indication colours are
shown in table 1.
a. Commissioning Cycle
•
Starts automatically after 24 hours of uninterrupted charging.
•
3 charge/discharge cycles to optimise battery’s full capacity.
•
Battery is charged for 24 hours before each discharge cycle.
•
No need for manual commissioning
b. Function Test
•
Carried out every 7 days.
•
Checks the function of the battery, lamp and power supply.
•
Lasts for few minutes only.
RB Intelligent Emergency Operation Guide
Operation
The light fitting will carry out the following function
automatically
after installation:
7.
The battery fuse located within the Bulkhead housing on emergency variants is
disconnected after final manufacturing testing. When installing the bulkhead
the battery fuse will need to be reconnected and the unit charged for 24 hours and
then discharged (repeated 3 times) to bring the battery up to peak capacity.
(Unless an ‘EMX’ intelligent emergency variant – see notes below)
8.
If a 4 core cable is used on emergency luminaires – L1, L2, N and E the link cable at
the front of the terminal block between L1 and L2 should be removed
9.
During emergency operation the light output and duration will be determined by
the variant purchased
10.
If carrying out Insulation Resistance tests the normal method of insulation
testing is to connect Live and Neutral together and test between this point
and Earth to prevent the risk of damage to the electronic control gear.