WASTE AND OVERFLOW ROUGH-IN
8. Assemble the female part of your expansion joint
to the P-trap.
**IMPORTANT** -
Be sure the expansion joint is
flush and level with the finished floor.
Once in place and flush with the finished floor – secure the
female expansion joint and P-trap to a floor joist with
a steel-strap to hold it in place.
9. Install the bathtub drain and connect the male expansion
joint, being sure you leave ample length to connect securely
to the female expansion joint below the floor.
10. To allow easy access for final connections, place the
bathtub (with the drain assembly in place) on two pieces of
4”x4” lumber directly above the floor opening and P-trap
location.
11. Proceed to insert and connect the male expansion joint
to the female expansion joint
and gently rest the bathtub on the finished floor.
12. Fill the bathtub with water to check that all water flows
freely to the waste outlet.
13. As water drains from the bathtub, inspect all
connections above and below the flooring for leaks.
14. Run a bead of silicone caulking around the bottom edge
of the bathtub where it meets the finished floor. Wipe away
the excess caulk with a damp cloth. Allow to set for 24
hours.