FX
2
Original/Chem
EN
20
Appendix B: Maintenance checklist
Copy the maintenance checklist, fill it in and save it as a service record.
For values, note the value in the result column, otherwise a tick will suffice if the item has
been performed or considered.
WARNING!
Risk of personal injury.
Always read section
before installation, use, service, or troubleshooting of this
product.
NOTE!
If a value is outside its accepted level, or a result is incorrect or missing, fix the
problem before initial start-up and normal operation.
Unit No.
Date:
Operating hours:
Performed by:
Items to inspect
Interval
Accepted level
OK
Repaired
Replaced Part number
Dismantle the arm. Clean the whole
arm internally and externally.
Annually
Adjust the links.
Annually
Check the mounting of the arm on
wall, bench or ceiling.
Annually
Check the airflow. If it is reduced, the
ventilation system must be inspected.
Annually
Summary of Contents for FX2 Original Series
Page 5: ...FX2 Original Chem 5 ...
Page 7: ...FX2 Original Chem 7 7 10 1 FX2 Orig FX2 Chem 3 6 8 11 9 2 4 5 7 10 1 3 6 8 11 9 2 4 5 3 4 ...
Page 8: ...FX2 Original Chem 8 6 7 5 ...
Page 9: ...FX2 Original Chem 9 9 10 8 ...
Page 10: ...FX2 Original Chem 10 Max 500 mm 19 69 in Max 1100 mm 43 31 in 11 ...
Page 12: ...FX2 Original Chem 12 14 A ...
Page 21: ...FX2 Original Chem 21 EN ...
Page 29: ...FX2 Original Chem 29 CS ...
Page 33: ...FX2 Original Chem 33 DE ...
Page 38: ...FX2 Original Chem DE 38 ...
Page 42: ...FX2 Original Chem ES 42 ...
Page 54: ...FX2 Original Chem FI 54 ...
Page 62: ...FX2 Original Chem FR 62 ...
Page 70: ...FX2 Original Chem IT 70 ...
Page 78: ...FX2 Original Chem NL 78 ...
Page 86: ...FX2 Original Chem PL 86 ...
Page 94: ...FX2 Original Chem SE 94 ...
Page 102: ...FX2 Original Chem CN 102 ...
Page 103: ......
Page 104: ...www nederman com ...