FlexPAK DX
9 Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the resuJClt column, otherwise, a tick will suffice if the item has been performed or
considered.
If a value is outside the limit or a result is incorrect or missing, this is to be rectified before the initial
start-up and normal operation.
Correct limits or results are given within brackets.
Unit No.
Date:
Performed by:
Control items
Result
Application requirements (limits)
Material chemical/thermal reaction risk
Radiation heat from surroundings
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight (product, accessories, and collected material)
Anchor bolts
Access for maintenance/filter replacement (1 m above the unit)
Mounting (check availability)
Maintenance switch
Installation room, ventilation openings
Plastic bag
Duct system
PS cable (optional)
Start and control unit, terminals 3–4
Duct system
Duct dimensioning/transport velocity, check the performance
Pressure resistant duct
32
Summary of Contents for FlexPAK DX
Page 7: ...FlexPAK DX A E E A B C D G F 3A J I H 45 3B 7 ...
Page 8: ...FlexPAK DX 13 12 10 9 7 8 2 1 3 4 6 5 11 4A 11 7 8 9 12 13 15 14 17 16 10 18 4B 8 ...
Page 10: ...FlexPAK DX 6 A B 7 10 ...
Page 13: ...FlexPAK DX 11 12 13 14 13 ...
Page 14: ...FlexPAK DX A A A A C Min 2 1m 83 15 1 0 m 39 4 16 A B C 17 14 ...
Page 36: ...www nederman com ...