ASSEMBLING
6
Mount the new spring.
12
Remove the
plastic stripes.
Fasten the
blue cover
with packing.
9
8
Refit the spring
lid and hub.
7
Tighten the spring
by turning the
drum in the outlet
direction with all
hose wound on,
2 - 4 turns.
10
13
Fasten possibly tool
on the supply hose.
Check that the required
length of hose can be pulled
out without stretching the
spring to its limit.
11
Put the supply
hose through the
hose outlet and
fasten the hose
stop.
Depositing of used spring unit
The used spring should be deposited to steelworks for
remelting or handled according to valid deposit rules.