
KORO ESPRESSO
7
© by
N&W GLOBAL VENDING S.P.A.
0503 257 - 00
SWITCH ON
Confirm?
Switching off
To switch off the machine use the main external switch.
Preliminary controls
Before starting operation, the machine presents a series of
controls to be made, showing their order on the display.
Close top panel
Piping (control referred to the spouts)
Mixers
Powder feeder
Coffee shutter
Switch on
Each indicated control is followed on the display by the
request: “Confirm?”.
To continue, press any selection button until the end of the list.
OPERATIONS TO BE CARRIED OUT
WITH THE DOOR CLOSED
Switching on
Set the main external switch located at the back, in the
lower right side, to “
ON
”.
Summary of Contents for Koro
Page 1: ...USER MANUAL UK English Koro Espresso DOC NO H 257U 00 EDITION 1 03 2005...
Page 14: ......
Page 16: ......