NEC Australia Pty Ltd
Xen Master & Xen Axis
7 - 212
Installing Optional Equipment
A6-3
240
00-6
42-
01 –
R
e
leas
e 4
.0
M
a
y
20
01
Pull out Line Cord’s modular plug from
Phone’s modular jack.
3.
PLug the CTU(S) Unit’s connector into
DTU-Type MLT’s Connector #1.
Figure 7-28 Opening the Base of the DTU-type MLT
Figure 7-29 Installing the CTU(S)-UA Unit