![NEC Univerge SV9100 System Hardware Manual Download Page 308](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845308.webp)
Issue 2.0
4-70
Installing the SV9100 Blades
5.6.2
Installation
To install the GCD-PRTA:
1.
Plug the GCD-PRTA into any universal slot in the chassis.
2.
Use Program 10-51-01 (PRI/T1/E1) to set the GCD-PRTA blade to
either PRI or T1 or E1.
3.
Connect the cable from the NT1 Network Termination cable to the
CN2 connector on the GCD-PRTA.
Figure 4-25 PRI Layout for NT-1
is a cabling diagram.)
5.6.3
LED Indications
NOTE
With normal operation, LED 1 flashes green.
NOTE
❍
The NT1 connects to the network through an 8-pin
RJ-45/RJ48C connector. Use either the RJ48C
plug-to-RJ48C plug, which ships with the CSU or an
RJ-45/48C plug-to RJ-45/48C plug straight through
or CAT5 cable to connect the T1 to the CSU. (Refer
to
Table 4-32 GCD-PRTA RJ48C Connector Pin-
❍
With PRI Networking, a crossover cable must be
used on the master system PRI/T1/E1 blade or
NT1to the telco demarcation. If the systems are
networked side by side and not through telco, a
straight-through cable is used.
Figure 4-25 PRI Layout for NT-1 Network
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...