![NEC Univerge SV9100 System Hardware Manual Download Page 267](http://html1.mh-extra.com/html/nec/univerge-sv9100/univerge-sv9100_system-hardware-manual_3943845267.webp)
Issue 2.0
SV9100 System Hardware Manual
4-29
3.2.4
LED Indications
LED indications for the GPZ-IPLE Daughter Board are indicated in
4-11 IPLE Daughter Board LED Indications on page 4-29
. Each LED is
listed with its associated function and LED and Operational status. Refer to
Figure 4-7 GCD-CP10 Blade with Daughter Boards Installed on page 4-16
for the location of the LEDs on the blades.
Table 4-12 IPLE Daughter Board LED CN1 Transmit/Receive Data
Indications
shows the LED indication when transmitting or receiving data on
CN1.
Table 4-11 IPLE Daughter Board LED Indications
LED
Function
LED
Status
Operation Status
Link 10
(D103)
10 Base-TX link speed indicator
On Red
10 Base-TX link up
LINK 100
(D102)
100 Base-T link speed indicator
On Red
100 Base-T link up
LINK 1000
(D101)
1000 Base-T link speed indicator On Yellow 1000 Base-T link up
ACT
(D100)
Link activity or data transmission
and reception
On Green LED lights when link up is
completed. LED flashes
when data is transmitting
or receiving.
Table 4-12 IPLE Daughter Board LED CN1 Transmit/Receive Data Indications
LED
Operation Status
ACT
Link1000
Link100
Link10
Off
Off
Flash
Flash
Internal Error (Hardware Error)
Off
On
Flash
Flash
On
On
Flash
Flash
On
Off
Flash
Flash
State of half-duplex transmission (Not
supported) Change HUB etc. to
full-duplex transmission.
Flash
Blinking one by one
The firmware is being updated.
The IPLE only supports full-duplex transmission.
Summary of Contents for Univerge SV9100
Page 1: ...System Hardware Manual A50 035028 001 GE ISSUE 2 0 SV9100...
Page 22: ...xviii Table of Contents Issue 2 0...
Page 42: ...xxxviii List of Tables Issue 2 0...
Page 72: ...Issue 2 0 1 18 Introduction to SV9100...
Page 76: ...Issue 2 0 2 4 SV9100 System Specifications Figure 2 1 SV9100 System Block Diagram...
Page 186: ...Issue 2 0 3 64 Installing the SV9100 Chassis Figure 3 78 Brackets Small Batt Box...
Page 238: ...Issue 2 0 3 116 Installing the SV9100 Chassis...
Page 269: ...Issue 2 0 SV9100 System Hardware Manual 4 31 Figure 4 12 VoIP Connections...
Page 317: ...Issue 2 0 SV9100 System Hardware Manual 4 79 Figure 4 29 Control Signal Connection...
Page 342: ...Issue 2 0 4 104 Installing the SV9100 Blades...
Page 476: ...Issue 2 0 6 26 Installing SV9100 Cordless Telephones...
Page 482: ...Issue 2 0 7 6 Installing SV9100 Optional Equipment Figure 7 5 PGDAD Connection Diagram...
Page 489: ...Issue 2 0 SV9100 System Hardware Manual 7 13 Figure 7 12 Installing a Door Box...
Page 499: ...Issue 2 0 SV9100 System Hardware Manual 7 23 Figure 7 17 PGDAD Connections...
Page 556: ...System Hardware Manual NEC Corporation Issue 2 0 SV9100...