![NEC Express5800/System Rack Service Manual Download Page 23](http://html.mh-extra.com/html/nec/express5800-system-rack/express5800-system-rack_service-manual_251319023.webp)
Planning Your Site 2-7
System Rack Placement
The system rack comes equipped with a front stabilizer that:
!
steadies the rack when you extend equipment for servicing, and
!
prevents creeping due to vibration.
The stabilizer is predrilled to allow you to secure the system rack to the floor.
Note:
If preparing the area prior to the arrival of the
system, review the power cable restrictions given in
“Electrical Facilities” before setting any stabilizer anchors.
Figure 2-2 gives the distance between anchoring holes when the stabilizer is
attached to the system rack.
17"
22"
Summary of Contents for Express5800/System Rack
Page 1: ... S e r v i c e G u i d e EXPRESS5800 System Rack ...
Page 2: ...xxx ...
Page 3: ... S e r v i c e G u i d e EXPRESS5800 System Rack ...
Page 16: ......
Page 28: ......
Page 42: ...4 4 Installing the System Rack Figure 4 1 Rack Mounted on Shipping Pallet ...
Page 68: ......
Page 69: ...6 Illustrated Parts Breakdown Field Replaceable Units Options ...
Page 74: ......
Page 76: ......
Page 77: ...xx ...
Page 78: ... 456 01544 000 ...