Part 2: Equipment configurations
The test equipment configurations for repair, test/calibration and simple
functional testing are shown below. Where specific items of test equipment are
required, make and model numbers are quoted.
2.1
Repair bench configuration
5.0v dc
Power Supply
Logic and TRX boards
DB2000 Repair
Fixture
DC Power Leads
GSM/PCN
Test Jig
GSM/PCN test set
Dummy
battery
(optional)
Oscilloscope
Spectrum Analyzer
Data Test Cable
RF Test Cable
This configuration is only an illustration of the types of equipment required. The
requirement for a Spectrum Analyser in each set up will be dependent upon which
GSM Test Set is chosen.
Summary of Contents for DB2000
Page 1: ...DB2000 Service Manual Help ...
Page 3: ... ...
Page 5: ... 2 3 4 2 2 2 2 2 0 0 0 5 3 4 2 6 2 7 2 2 2 2 0 8 9 2 2 2 2 2 2 2 2 ...
Page 7: ... 2 6 2 2 2 2 2 3 4 2 2 0 2 ...
Page 8: ... 2 ...
Page 9: ... Previous Section Next Section Main Menu Section 2 Unit Specifications ...
Page 77: ... 1 2 ...
Page 83: ...Fit Antenna INSERT AND SCREW THE ANTENNA INTO THE ASSEMBLY ...
Page 107: ...Fig 3 7 GSM_LNA Pg 3 3I TP419 Fig 3 8 PCN_LNA Pg 3 3J TP420 Fig 4 9 TCXO Pg 2 H11 TP413 ...
Page 109: ...Fig 4 3 PCN_TX Pg 1 1J TP417 Fig 4 4 3V_G_TX Pg 1 4I TP100 Fig 4 5 3V_P_TX Pg 1 4J TP101 ...
Page 110: ...Fig 4 6 GSM_ON Pg 1 2K TP402 Fig 4 7 PCN_ON Pg 1 1K TP415 Fig 4 8 PRE_ON Pg 1 4J TP416 ...
Page 112: ... I Q ...
Page 113: ...Fig 4 14 V_ERROR PCN Pwr Lvl 7Pg 1 16I Fig 4 15 300khz Charge Pump Pg 1 Log 9G ...
Page 115: ... Previous Section Next Section Main Menu Section 6 Device Device Information Information ...
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ... Previous Section Next Section Main Menu Glossary of Terms ...