Section 1: Installing the Cabinet
1-20
◆
Section 1: Installing the Cabinet
Aspire S Hardware Manual
COMPLETING THE INSTALLATION
Setting the Cable Pass-Through
The each cabinet has two cable pass-throughs - one each on the left and right sides of the cabinet. The block
plate should be in place for any unused pass-through in order to help keep dust out of the cabinet.
1.
There are two opening options - one setting provides a small pass-through, the other provides a
larger pass-through. Determine which type is required for the cabinet.
Figure 1-18: CABLE PASS-THROUGH
0893130-15
Block Plate
Cabinet