2010-10-26
Network Design and Engineering Guide
97
Outdoor Unit and Satellite Link Design
SkyWAN
®
Link Budget Calculation Tool
Hub Stations
The master and backup master station must be defined with 2 demodulator boards with the
home channels carrier 1 and 2:
Figure 3-26
MRB DUB Network - Hub Stations
UpLink Area 1 (ULA1)
The slave stations of ULA1 use carrier 1 for the primary demodulator. Any ULA1 station which
should be able to communicate directly with a station in ULA2 must have a second demodulator
using carrier 2 as its home channel. In this example the stations in Rome and Johannesburg
have no direct link to the stations in America, whereas Casablanca has a direct link via its sec-
ond reception channel:
Figure 3-27
MRB DUB Network - ULA1 Stations
Summary of Contents for SKYWAN IDU 7000
Page 1: ......
Page 2: ......
Page 6: ...Page intentionally left blank 2 Network Design and Engineering Guide 2010 10 26...
Page 12: ...Page intentionally left blank 8 Network Design and Engineering Guide 2010 10 26...
Page 16: ...Page intentionally left blank 12 Network Design and Engineering Guide 2010 10 26...
Page 22: ...Page intentionally left blank 18 Network Design and Engineering Guide 2010 10 26...
Page 76: ...Page intentionally left blank 72 Network Design and Engineering Guide 2010 10 26...
Page 134: ...Page intentionally left blank 130 Network Design and Engineering Guide 2010 10 26...
Page 138: ...Page intentionally left blank 134 Network Design and Engineering Guide 2010 10 26...
Page 144: ...Page intentionally left blank 140 Network Design and Engineering Guide 2010 10 26...
Page 153: ......
Page 154: ...www ndsatcom com...