106
Network Design and Engineering Guide
2010-10-26
Outdoor Unit and Satellite Link Design
Link Budget Examples
3.6.3
Scenario 3: Ku-Band 5 Stations Star Network with 3 Hubs
Finally we consider a slightly different scenario by assuming that now the station in Rome
should also operate as a hub station for the network. Therefore, the home channel for Rome is
changed to carrier 1.
For the calculation of this network the link filter matrix is used: Network topology on carrier 2 is
set to “Meshed in ULA1” but the calculation of the satellite link loops for Casablanca and Tunis
as well as the links between these two stations are suppressed by entering “0” for these links
in the link filter matrix (cf. corresponding picture in chapter 3.6).
If all other network parameters are unchanged, the link budget calculation result is similar to
the scenario 2 with 2 hub stations. The only difference is that now in Casablanca also a 30 W
amplifier is needed, due to the higher rain margin required for the downlink to the hub in Rome,
which is located in rain zone K.
Summary of Contents for SKYWAN IDU 1070
Page 1: ......
Page 2: ......
Page 6: ...Page intentionally left blank 2 Network Design and Engineering Guide 2010 10 26 ...
Page 12: ...Page intentionally left blank 8 Network Design and Engineering Guide 2010 10 26 ...
Page 16: ...Page intentionally left blank 12 Network Design and Engineering Guide 2010 10 26 ...
Page 22: ...Page intentionally left blank 18 Network Design and Engineering Guide 2010 10 26 ...
Page 76: ...Page intentionally left blank 72 Network Design and Engineering Guide 2010 10 26 ...
Page 134: ...Page intentionally left blank 130 Network Design and Engineering Guide 2010 10 26 ...
Page 138: ...Page intentionally left blank 134 Network Design and Engineering Guide 2010 10 26 ...
Page 144: ...Page intentionally left blank 140 Network Design and Engineering Guide 2010 10 26 ...
Page 153: ......
Page 154: ...www ndsatcom com ...