
2-23
Hardware Installation
d. Route the cables through the neck slot then push cables through the curved
neck opening and then out the base opening. Align the Audio Cable and Display
Port Cable to the left side and the 12V USB Cable to the right side.
e. Pull cables such that most of the cables have been fed through the base opening.
6. Position the display and stand assembly in an upright position.
Summary of Contents for XL15
Page 1: ...User Guide NCR XL15 5915 Release 1 0 BCC5 0000 5162 Issue C...
Page 20: ...Product Overview 1 11 Checkstand Mount 5968 K039 Wall Mount 7702 K320...
Page 21: ...1 12 Product Overview Third Party Mounts VESA Adapter 5915 K320...
Page 22: ...Product Overview 1 13 Customer Display 7702 K453...
Page 24: ...Product Overview 1 15 Label Locations...
Page 37: ...Hardware Installation 2 28...
Page 39: ...Hardware Installation 2 30...