
Confidential and proprietary information of NCR Voyix Corporation.
Unauthorized use, reproduction and/or distribution is strictly prohibited.
14
4. Do the following:
a. Move the Bagwell beside the Core Cabinet.
b. Slightly lift the Bagwell up and over the partially threaded screws.
c. Tighten the screws to secure the Bagwell.
Note
Ensure that the Bagwell does not wobble or rock by placing your hands and
exerting moderate pressure on various parts of the Bagwell. Adjust the
Leveling Feet, if necessary.